Monday, January 23, 2012

Order / Force using Control-M / EM GUI


Order/Force a Job:

Click the Icon on the Toolbar or select Tools -> Order/Force a Job (Cntrl+R is the shortcut key)


You will get Order/Force dialog box. You have to select Control-M (Data center) and Table from the dropdown list to display all the jobs in that table. Then you can select the job which you want to order/force job.

Difference between Order and Force:
  • Order: will bring the in to AJF if the job is in schedule.
  • Force: will bring the job into AJF irrespective of the schedule.
Note: If you would like to bring the job with HOLD then you need to select ‘Order/Force with Hold’ option.

0 comments:

Post a Comment

Twitter Delicious Facebook Digg Stumbleupon Favorites More

 
Design by Awesome Deals | Bloggerized by Mahendra - 24x7FunOnline